|
one16thTiger.com |
ver3.0 |
|||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||
Up to this point the following interior hull fittings have been installed, all bearing lubrication lines and batteries, the battery holders, supports for the superstructure front plate, the hull floor side rails, and the front hull drain mechanism. These parts are all direct representations of the information at Tiger1.info and built from Evergreen styrene products and brass or fine solder.
|
|||||||||||||||||||||||||||||||||||||||||||||||
Home Tiger I WorkBench Finished Links Contact Us
|
|||||||||||||||||||||||||||||||||||||||||||||||